Chronic Logic

Pontifex => General Discussion => Topic started by: Sarterixa on October 17, 2001, 02:50:38 AM

Title: Complex Level 11
Post by: Sarterixa on October 17, 2001, 02:50:38 AM
Well, you already got a screenshot, but I did it by swinging the bridge into place.  Cost like 11k.  Don't have any screenshots, but basically start building the floor a block or two over the water in a rampish shape and attach cables from the further parts of the ramp to the hook so it swings down.
Title: Complex Level 11
Post by: halo1337 on October 17, 2001, 01:37:01 AM
I can't seem to find a solution for this level. Does anyone have any solutions? Screens would be nice. Preferably in edit mode. I have spent days trying to solve it, but it is beyond me.
Title: Complex Level 11
Post by: Slivingsto on March 22, 2002, 09:22:11 PM
My method for this level was very similar to Chillians, But it is possible to make the deck straight across if you put two heavy steel bars three squares across on either side of the bridge.
Title: Complex Level 11
Post by: halo1337 on October 17, 2001, 02:10:42 AM
anyone?
Title: Complex Level 11
Post by: on October 17, 2001, 02:20:27 AM
Here's my dirty, messy, noisy, expensive solution!

I'm certain there are lots of better ways to do it!